Work problems

Work problems are solved with rates, not times: a job done in 6 hours is 1/6 of the job per hour. Add the rates of people working together, then invert.

Turn every time into a rate first. If Ana can paint a room in 6 hours, she paints 1/6 of it each hour; if Ben takes 3 hours, he paints 1/3. Working together they paint 1/6 + 1/3 = 1/6 + 2/6 = 3/6 = 1/2 of the room per hour, so the room takes 2 hours. The trap is averaging the times: (6 + 3) / 2 = 4.5 hours is slower than Ben working alone, which cannot be right. Two people together always finish sooner than the faster one alone - a quick check that rules out wrong options before you calculate.

The same rule runs backwards and with opposing work. If Ana alone takes 10 days and Ana and Ben together take 6, Ben's rate is 1/6 - 1/10 = 5/30 - 3/30 = 2/30 = 1/15, so Ben alone takes 15 days. A pipe that fills a tank in 4 hours with a drain that empties it in 6 has a net rate of 1/4 - 1/6 = 3/12 - 2/12 = 1/12, so the tank fills in 12 hours: the drain's rate is subtracted because it undoes work.

When the problem counts workers instead of naming them, multiply to get the size of the job. Eight workers finishing in 12 days is 8 × 12 = 96 worker-days of work, so six workers need 96 / 6 = 16 days. And when it asks how much is done after some time, the answer is rate times time: a crew that needs 9 days finishes 5/9 of the job in 5 days - which is exactly the question below.

Worked examples

Try these, then read why.

Written for this platform and generated from the same bank the practice sets draw on. Every wrong option is explained, because knowing why a distractor was tempting is most of the learning.

A maintenance crew can repaint the whole building in 9 days. Working at the same rate, what part of the job is finished after 5 days?

  1. A5/9 (correct)
  2. B4/9
  3. C5/14
  4. D9/5

A uniform rate means each day finishes the same share of the job: one day is 1/9 of it. After 5 days the crew has finished 5/9, which reduces to 5/9. Check the direction before dividing: the part done is always the smaller number over the larger one.

  • B This is the part of the job still to do, which is what is left rather than what is done.
  • C This compares the elapsed days with the total of both figures instead of with the length of the job.
  • D This divides the whole by the part. The part finished cannot be larger than the whole job.

A cleaning crew can wash all the windows of the building in 38 days. Working at the same rate, what part of the job is finished after 26 days?

  1. A19/13
  2. B6/19
  3. C13/19 (correct)
  4. D13/32

A uniform rate means each day finishes the same share of the job: one day is 1/38 of it. After 26 days the crew has finished 26/38, which reduces to 13/19. Check the direction before dividing: the part done is always the smaller number over the larger one.

  • A This divides the whole by the part. The part finished cannot be larger than the whole job.
  • B This is the part of the job still to do, which is what is left rather than what is done.
  • D This compares the elapsed days with the total of both figures instead of with the length of the job.

Kayang tapusin ng isang pangkat ang pagpinta sa buong gusali sa 10 araw. Kung pare-pareho ang bilis ng paggawa, anong bahagi ng gawain ang natapos pagkaraan ng 6 araw?

  1. A6/11
  2. B3/5 (correct)
  3. C3/8
  4. D5/3

Sa bawat araw ay natatapos ang 1/10 ng gawain. Sa 6 araw, 6/10 = 3/5 ang natapos.

  • A Isang araw ang sobra sa denominador, kaya hindi ito ang bahagi ng buong gawain.
  • C Idinagdag nito ang lumipas na araw sa kabuuan bilang maling denominador.
  • D Binaligtad nito ang lumipas na araw at ang kabuuang araw; hindi maaaring lumampas sa buong gawain ang natapos.